Projects

SAUDI ARAMCO

Upgradation of Total Water Management System by replacing existing and adding more wireless flowmeters to plant water supply system.

Location : Abqaiq Plant

PROJECT SAR- COST : 4,915,574.65

SAUDI ARAMCO

Replacement of obsolete outdoor MCC(s) with state of the art indoor MCC(s)

Location : SSP, Abqaiq

PROJECT SAR- COST : 4,469,100.00

SAUDI ARAMCO

Supply, installation, T&C of field instruments and control System using DeltaV SIS ESD Marshaling and ControlWave Micro RTU for all BFPT(s)

Location : .NSP, Abqaiq

PROJECT SAR- COST : 6,900,000.00

SWCC/Torishima

Installation of three Pumps and Allied MV and LV electrical System

Location : SWCC, Khafji

PROJECT SAR- COST : 2,476,932.00

Muhaidib / KSICC

MV/LV Electrical Works

Location : Madina

PROJECT SAR- COST : 2,000,000.00

Marafiq / Kafou

Installation of wringing Separator

Location : Beri Plant-Marafiq

PROJECT SAR- COST : 2,000,000.00

SAUDI ARAMCO

To supply, fabricate and install compressed air battery at GOSP-2,3,4,7 and 13

Location : Udhalia

PROJECT SAR- COST : 1,600,000.00

Marafiq / Torishima

Installation of two Pumps and allied VFD equipment

Location : Marafiq, SWP-2

PROJECT SAR- COST : 2,200,000.00

Eurotech / Muhaidib

Birman Strategic tank farm E&I works

Location : Khumra/Jeddah

PROJECT SAR- COST : 1,900,000.00