CONSTRUCTION OF JANA PLANT IN STAGES
SAUDI ARAMCO
Upgradation of Total Water Management System by replacing existing and adding more wireless flowmeters to plant water supply system.
Location : Abqaiq Plant
PROJECT SAR- COST : 4,915,574.65
SAUDI ARAMCO
Replacement of obsolete outdoor MCC(s) with state of the art indoor MCC(s)
Location : SSP, Abqaiq
PROJECT SAR- COST : 4,469,100.00
SAUDI ARAMCO
Supply, installation, T&C of field instruments and control System using DeltaV SIS ESD Marshaling and ControlWave Micro RTU for all BFPT(s)
Location : .NSP, Abqaiq
PROJECT SAR- COST : 6,900,000.00
SWCC/Torishima
Installation of three Pumps and Allied MV and LV electrical System
Location : SWCC, Khafji
PROJECT SAR- COST : 2,476,932.00
Muhaidib / KSICC
MV/LV Electrical Works
Location : Madina
PROJECT SAR- COST : 2,000,000.00
Marafiq / Kafou
Installation of wringing Separator
Location : Beri Plant-Marafiq
PROJECT SAR- COST : 2,000,000.00
SAUDI ARAMCO
To supply, fabricate and install compressed air battery at GOSP-2,3,4,7 and 13
Location : Udhalia
PROJECT SAR- COST : 1,600,000.00
Marafiq / Torishima
Installation of two Pumps and allied VFD equipment
Location : Marafiq, SWP-2
PROJECT SAR- COST : 2,200,000.00
Eurotech / Muhaidib
Birman Strategic tank farm E&I works
Location : Khumra/Jeddah
PROJECT SAR- COST : 1,900,000.00